1. Main content of project
proposal and requirement |
|
1) Chinese party, including the name
of the Chinese party, generals of production or business operation status,
legal address, name and post of legal representative, and the name of the
competent departments concerned. 2) Purpose of joint
venture. Prominent place must be given to the description of necessity and
possibility of foreign exchange earning export and the introduction of
technology. 3) Foreign party,
including name of the foreign party, registration country, legal address
and name, post and nationality of legal representative. 4) Business scope and
scale of the joint venture. Prominent place must be given to the
description of the necessity of the project, overseas demand for product
and production status abroad and market place.
5) Investment
estimate. Referring to the sum of fixed funds and circulating funds needed
for the joint venture project. 6) Investment mode and
source of funds, including ratio between investments and ratio in capital
composition. 7) Production
technology and key equipments. Descriptions of the advance, usability,
reliability and important technical economical indices of the technology
and equipments. 8) Quantity and source
of key basic materials, water, electricity, gas and transport service. 9) Number, composition
and source of personnel. 10) Economic benefit.
And emphasis should be placed on the description of the arrangement of the
foreign exchange receipts and disbursements. 11) Attachment: a) Intent letters of
parties to the joint venture. b) Credit information
form of foreign party. Note:
The contents and format required here for project proposal are based on
the assumption that the foreign cooperator has been chosen. However, if
your project is a very good one, you are allowed to make no decision about
who or which should be chosen as the cooperator so that you could choose a
better foreign investor. In that case, the project should be approved
first, as for the section about foreign investor required in the project
proposal; you can make a supplementary report for record after the
cooperator has chosen. If the examination and approval authority makes no
reply within one month after receiving credit information form of the
foreign cooperator, then this may be regarded as approval and work can go
on to the feasibility study report.
|
¡¡